Thursday, August 30, 2012

First sod installed!

 Installing drainage trenches in bunker on #2 front right bunker.
Expanding the right side of the 3rd green to the edge of the fill pad.  Can't wait to see the balls fall over the edge!
Sodding the green and collar, finally, putting something back together
Picture from the left Approach bunker on #2.
Tyler shaping the right fore-bunker, #2.
Fore-bunker on #2 roughed in.
TDI draining #2 left Approach bunker.

Sod removed from front of #2 green for irrigation enstallation and lowering of mound in front of green.

Monday, August 27, 2012

Saturday, August 25, 2012

8/24/12

Right side of #4 green from the back that will be transformed into green and collar.

Jeff Hnatow reconnecting a bundle of Irrigation wires 

Drainage in the bottom of #3 right green side bunker.

#2 Green side bunker taking shape.

Left side of #2 green.

  1. The first week seems so exciting, all the bunkers are opened up and molded into rough shapes of what's to come.  The second week looks as if progress has halted with no new bunkers of any significance,  being roughed in.   In the second week all the boring and tedious task of drainage, finish grading,  repairing and installing irrigation takes place.  Week three the project cycles back to the first week, opening new ground on holes #2 and #1, along with sodding of all bunkers on holes #3!!!!

Thursday, August 23, 2012

8/23/2012


Sod is removed from area in lower right corner of pict. where bunker is to be rebuilt.  Second pile of soil is where bunker is being removed.

View of bunkers being rebuilt on left side of #4.

Ron Prichard sketching changes to #11 green in his head!

Left side of # 4 green prior to resodding

Right fairway bunker being drained and bagged, almost ready for sodding.
The remainder of this week will be spent prepping bunkers on #3 and 4 for sod, and roughing in the bunkers on hole #2.   Next week TDI plans to sod bunkers on hole #3 and 4, rough grade bunkers on hole #2 and begin working on bunkers on hole #1.  The week of Sept. 3rd TDI plans to bring in a special crew to begin work on modifications to green #3,9,11 and 12.   Each green will take a few days to complete, with the exception of #12 which will take a week or more to complete.

Wednesday, August 22, 2012

Golf Course Renovation Restoration

6" Drain Tile being installed across #4 fairway.

Finish grading of bunker face on right fairway bunker #4

Prepping bunker bottom for drainage installation on #4 left bunker.


Back right bunker on #4 left.

Grading left fairway bunker on #3.

Stripping sod off of #2 greenside bunker.