Green work on #3 began yesterday(mon.)

 Stripping sod off of green area where swale is to be constructed.
Removing  top portion of the green soil to shape swale.
Trenching the desired bottom grade of the swale prior to total soil removal.
Removing sod from ?two bunkers on #6


Draining right Fore Bunker on #2.