Saturday, September 22, 2012

 Sod striped on #8, left green side bunker being shaped.
 #8 left green side bunker.
 Tyler trenching drainage into rough from #7 fairway bunker. Drainage always reminds me of my Grandmother, who would always say,  " you never want to grow up to be a ditch digger"!
 Drainage being installed on #7 fairway bunker.
 Sting ray?   
 #8 from the tee will be well guarded!
 Construction committee members Dede Owen, Chris Coffman and Kirk Dodge out for weekly meeting and inspection.
 First left fairway bunker on #9 being modified.
 Defining bunker edges on left approach bunker on #8.
Troy supervising Mitch attaching tow strap to dead golf cart on #4.

No comments:

Post a Comment